Shower waterproofing before tiling: what the job involves

Shower waterproofing before tiling is the step that decides whether a new bathroom stays watertight. Once the tiles are down, the membrane underneath cannot be seen or easily repaired. This guide explains what the job involves, from the screed and the floor-wall junction to the drain and the checks before tiling, so you know what to expect and what a quote should include.

Request a quote

Why it matters

Tiles and grout are not waterproof

Ceramic and porcelain tiles shed most water, but grout lines, hairline cracks and the joints around fittings let water through every time the shower runs. Cement-based tile adhesive and screed absorb that water. Without a continuous membrane underneath, it travels through the floor and walls until it finds a way out: a stain on the ceiling below, swelling in a timber door frame, or damp skirting in the next room.

A shower leak is often slow and steady rather than sudden, so it can go unnoticed for months. By the time it shows, the bedding and screed may be saturated. That is why the waterproofing has to be right before the tiles go on.

Weak points

Where showers usually leak

  • The floor-wall junction, where floor and wall move slightly differently and a crack can open.
  • The drain, if the membrane is not properly bonded to a drain flange or collar designed to receive it.
  • Pipe penetrations for the mixer, shower arm and any niche lighting.
  • Wall niches and shelves, which have several corners in a small space.
  • The threshold or hob, especially on level-access or walk-in showers with no step.
  • Screen and grab-rail fixings drilled through the tiles after the membrane is in.

Before the membrane

Preparing the substrate

The membrane is only as good as the surface it goes on. The floor screed should fall towards the drain so water does not sit in corners, and it should be cured, clean and sound, without hollow or loose areas. Walls should be flat and dry, whether they are plaster, render or a board system designed for wet areas.

Any cracks are repaired first, and a primer is applied if the system calls for one. If old tiles have been removed, the remaining surface needs to be checked carefully, because adhesive residue and damaged screed can stop the new membrane bonding.

The membrane

Applying the waterproofing

Most shower waterproofing in South Africa uses a liquid-applied membrane, either cementitious or polymer-based, brushed or rolled on in at least two coats. Reinforcing tape or fabric is bedded into the first coat at every floor-wall junction and internal corner, and preformed collars or patches go around pipes. The drain should have a flange or fitting that the membrane can be bonded into, so water that reaches the membrane is led into the drain rather than around it.

The extent of the waterproofing should be agreed in advance: the whole shower floor, the walls of the shower area to an agreed height, and, in many bathrooms, the rest of the floor with an upturn at the walls. For upstairs bathrooms and walk-in showers without a screen, covering the whole floor is especially worthwhile. Each coat must cure before the next one, and the finished membrane needs to reach the thickness the manufacturer specifies.

Before tiling

Checking the membrane before tiles go down

Once the membrane has cured, it should be inspected for pinholes, thin areas and any gaps at junctions and penetrations. A flood test is a useful check: the drain is plugged, the floor is filled with a shallow depth of water for a period, and the ceiling or room below is checked for any sign of a leak. It costs a little time but is much cheaper than lifting new tiles.

Photographs of the finished membrane, including the corners, the drain and the pipe collars, are worth keeping. They are a record of what is under the tiles if questions come up later.

Working with the tiler

Protecting the membrane during tiling

The tile adhesive should be compatible with the membrane, and the tiler needs to avoid damaging it with tools, spacers or fixings. Movement joints at the floor-wall junction and at changes of plane should be filled with a flexible sealant rather than grout. Screens, rails and shelves should be fixed with care, and any holes through the membrane sealed as part of the job.

It helps if the waterproofing and tiling are planned together, so that drain levels, threshold heights and the falls in the screed suit both.

Existing showers

If a shower is already leaking

A leaking shower is sometimes caused by failed silicone or grout alone, and resealing can help for a while. If water has been getting through for some time, though, the membrane underneath has usually failed or was never there. In that case, the lasting fix is to remove the tiles in the shower area, check and repair the screed, install a new membrane and retile. Coatings applied over existing tiles are sometimes offered as an alternative; they can be useful in limited cases, but the quote should say clearly what they can and cannot do.

Comparing quotes

What the quote should include

  • The product name and type, the number of coats and the areas covered, including wall heights.
  • How the floor-wall junction, corners, niches, drain and pipe penetrations are detailed.
  • Substrate preparation and any screed repairs or new falls.
  • Curing time, any flood test and who coordinates with the tiler.
  • What is excluded, such as plumbing changes, tiles and fittings, and what guarantee, if any, applies and on what terms.

Written by The Waterproof Company.

Next steps

Read more about shower waterproofing, or about upstairs bathrooms in flats and townhouses on our waterproofing in Johannesburg page. When you are ready, request a quote.